Energy centers at gas fields for miners
→ We build energy centers for mining from 2022
13
Implemented energy centers
45
megawatts on operational maintenance
6
years in gas generation market
JSC (Joint Stock Company) «Power Systems» specializes in construction of high-efficiency mobile energy centers directly on gas fields.
About company
By minimizing transportation costs and gas storage, directly using associated gas or natural gas from dead-end fields, we not only minimize the electricity production cost and reduce the cost of mining cryptocurrencies, but also, we protect the environment and ecology, excluding the need to burn such gas.
The geography of our projects
Energy centers created by the company for 2023-2024 years, which are on our operational service:
Penza region
3 energy centers; 2,8 mW, 4,2 mW and 1,1 mW
Saratov region
4 energy centers; 1,6 mW, 6 mW, 4 mW and 2 mW
Volgograd region
1 energy center; 1,8 mW
Khanty-Mansi Autonomous Area
1 energy center; 2,0 mW
Belgorod region
1 energy center; 1,8 mW
Orenburg region
1 energy center; 1,6 mW
Approved plans of the company are to launch the following facilities by the end of 2024:
Saratov region
1 energy center 10,0 mW
Volgograd region
1 energy center 6,0 mW
All these capacities are only for computing power for mining. The company was founded in 2005, since 2018 Since 2018, it has been actively working in the gas generation market. Since 2020, it has been working in the gas generation market for mining, since 2022, the construction of efficient energy centers directly on gas fields.
Gas production in Russia in 2023 amounted to 638 billion cubic meters, according to Rosstat materials. Recall the indicators of previous years: 2021 — 763 billion, 2022 — 676 billion. The base expectations for 2024 are 666.7 billion cubic meters.

According to the long-term forecast of the development of the energy and gas markets until 2050 provided by the Federal State Economic Commission for Europe, the share of oil will fall to 26%, coal to 18%. Natural gas will become the only fossil type of fuel, the usage of which will increase from 23% to 27%. About 66% of the additional gas demand until 2050 will be in the industrial sector and electricity generation.
A gas piston power plant is a generation system based on a reciprocating internal combustion engine powered by natural or other combustible gas.

Through the long-term experience in logistics, installation and maintenance of gas piston power installations, our company has key solutions for the most efficient equipment of energy centers for mining. Direct contracts with the main Chinese manufacturers of gas piston power plants guarantee the best price, the high execution speed and priority in solving problems of any complexity.
Mining is the activity of creating new blocks in the blockchain to ensure the functioning of cryptocurrency platforms.

Our company's expertise is also the direct import of computing equipment from China, construction and operation of specialized containers for further placement of this equipment. we select for you the most energy efficient and advanced ASIC miners for quick return on investment and serve them 24/7 on the territory of our energy centers.
Completed projects
Company:
Tatischevsky energy center
The power center with a total capacity of 2 mW is located in the Tatishchevsky district of the Saratov region
The energy center is designed to generate cryptocurrencies and operates from the associated gas produced from an existing field.

It was put into operation in 2024 and has already proved its economic efficiency for consumers in terms of the cost of electricity.
Completed projects
Company:
Surovka
Energy center is located on the current natural gas field and equipped with gas generator plants with a single capacity from 200 to 800 kW.
With a capacity of 6 MW, it was put into operation in the summer of 2024. The total number of plants is 30 pcs. The energy center is designed to provide stable electricity to cryptocurrency mining centers.

It is equipped with infrastructure, modern containers for network equipment placement, video surveillance and a broadband Internet channel. The service staff is at the facility in 24/7 mode, ensuring the smooth operation of gas generators and computing equipment.
Калькулятор Окупаемости Майнинга

Profitability calculator

ЦPrice with VAT in rubles:

203560 rub

Number of devices:

264

Consumption:

3.65kW/h

Hashrate:

151TH/s

59890.01 $

binance.com

96.90

www.cbr.ru

Calculation results

The total cost of the 1 MW project:

88 194 863 rub

Monthly profitability:

2 647 576 rub

Total payback time:

33 Month

Profitability per Month (%):

4.93 %

Profitability per Year (%):

59.12 %

CEO of Power Systems JSC, Pavel Vladimirovich Volkov
Interview
During the interview, he provided detailed insights into the advantages you will gain by partnering with our company.

With years of experience and a team of professionals, we ensure reliability, stability, and maximum profitability for your business.
Are you ready to receive an individual calculation?
Leave the request and we will develop the solution that is perfect for your project.